CLOSE
Home Portfolio List of Consulting Experiences

List of Consulting Experiences

YearProject Title
2006
Assessment of Corrosion Protection System for 8" Gas Pipeline
Cathodic Protection Programs of PBA Gas Plant
2007
External Corrosion Assessment of Pabelokan Gas Plant
Tube Leak Analysis of Zelda F Heat Exchanger E-200
Re-evaluation & Re-engineering of Mixed Xylene Tank
Failure Analysis of Check Valve Stud Bolt
2008
Failure Analysis of Cooler & Corrosion Protection Assessment
Corrosion Protection Assessment of Banuwati-A and Zelda-PC Platforms
Heat Exchanger Inspection
Pipeline Risk Assessment
Pipeline Integrity Systems
Failure Analysis of GTG#1 Bolt at Seafox
Failure Analysis of Wire Rope
Chartered Institute of Purchasing and Supply Survey
Corrosion Assessment of Gas Facilities
Material Testing of Inconnel 600/625
2009Failure Analysis of Cracking Boiler
IMR Plan Development for Underwater Facilities
Corrosion Rate Calculation Analysis
2010
Corrosion Analysis of Piping Detail
Corrosion Analysis of Pipeline & Conductor Detail
Failure Analysis of Bolt
Failure Analysis of Cooler at KRA Platform
Stress Analysis of Savitri-A Failed Conductor
Study, Evaluation and Run Simulation
Failure Analysis of Gas Plant Broken Bolt
2011
Inspection & Assessment of Pabelokan Gas Plant
Thermographic Inspection
Asset Integrity of Topsite Facilities
Risk Based Inspection Area FOC I & LOC I Kilang PT. Pertamina (Persero) Refinery Unit IV Cilacap
Pipeline Integrity Management System Development Phase 2
Failure Analysis of Flexible Hose / Expansion Joint
Failure Analysis of Excavator Stick Arm
Mechanical Testing of Bolt and Spacer
2012
Failure Analysis of 320D Boom Cracking
Fitness for Service of Shell & FEM Regenerator of FCCU Kilang Sungai Gerong
Failure Analysis Sampel Pipa 6” Batu Ceper & Pipa 10” Pasar Cibinong
2013Re-run Risk Based Inspection for Supat Field
Fluid Sampling Analysis in CBU & NBU Area
Failure Analysis Sample Pipa Baja Jalur Paya Pasir - Simpang Kantor Diameter 12"
Failure Analysis Pipa diameter 4 dan 6 inci Area Banten Timur dan Pipa diameter 4 inci Area Industri Bogor
Asset Integrity Management System Phase 1 Development
2014
Gas Analysis of H2S and Methane for Rama-H
Hardness Test for Spacer
Pilot Project of Risk Based Inspection
Failure Analysis Sampel Insulating Joint 4” PT. Taehan Textiles & CV. Triona Multi Industri
Gas Analysis of H2S and Methane form V-808 and H-800 Krisna-P
Failure Analysis of Chemical Tube
Failure Analysis of Valve Bolt
Coating / Painting Testing
Failure Analysis of Flexible Hose
Pilot Testing for Non Metallic Pipeline
Painting Test
Risk Based Inspection on PCMS
2015
Material Examination & Analysis of Steel
Lube Oil Analysis of 4 Sample
Study Review of Failure Analysis GT 7”
High Risk Risers Inspection by Long Range Ultrasonic Testing
Risk Based Inspection of 10 Unit Tank
Pipeline Integrity Management System Detail Review and Reporting for 5 (five) Pipelines Assessment
Pipeline Protection Assessment
Pipeline Corrosion Assessment
Perhitungan Operasi Berdasarkan Hasil Insitu Metalografi dan Uji Keras BW Boiler
Improvement of Pipeline Integrity Management System Methodology
Risk Based Inspection of 95 Unit Tank
2016Pipeline Integrity & Corrosion Engineering
Pemeriksaan dengan Insitu Metalografi untuk Boiler di PT. Vale Indonesia - Sorowako
Perhitungan untuk Remaining Life Time (RLT) untuk BW Boiler di lokasi PT. Vale Indonesia - Sorowako
Hot Oil Analysis
Service for AIMS Phase 1 & PIMS Maintenance
Pemeriksaan Material pada 2 Unit Tangki LPG Arun NGL - Aceh dengan Metode Insitu Metalografi (10 Spot Tangki)
Risk Based Inspection of 120 Unit Tank
Inspeksi Elektrikal Terminal Crane
Provision of Project Support Service FE GPO
Provision of Development of Corrosion under Insulation (CUI) Management Services
Lube Oil Analysis
Fitness for Service Assessment 10" Rangau GS
Laboratory Servics for On Site Fluid Sampling and Analysis
Fitness for Service Assessment 16" Crude Oil Pipeline Simpang Cucut to Pematang
2017Failure Analysis of Cut off Shaft PU-C301B & PU-C503B
Fitness for Service Jalur Pipa Baja
Crude Oil Krisna and Rama Analysis
In-situ Metalografi Tube Furnace PS2
Pipeline Assessment 28 inch WIKA-RABANA-KELSRI
RBI Assessment and Inspection Plan of Pressure Vessels
Fitness for Purpose, Failure Avoidance and Asset Life Extension
Cathodic Protection Survey & Analysis Services
Provision of Cathodic Protection Survey for KGPF
Riser Integrity Assessment at PHE WMO
Riser Assessment Third Party Activity Around Jetty at PHE WMO
Pipeline Free Span Assessment and Scoping for Recertification
2018Failure Analysis For Tube HE C523
Level 3 Pipepline Dent Asssessment at PHE WMO
Risk Based Inspection Assessment
Pekerjaan Studi RBI Peralatan Statistik PT. Badak NGL
AIMS & PIMS Maintenance
Pekerjaan Jasa Remaining Life Assessment terkait Resertifikasi/Sertifikasi Peralatan di PT. Pertamina EP Asset 3 - 320 Bejana Tekan / Vessel
Pekerjaan Jasa Remaining Life Assessment terkait Resertifikasi/Sertifikasi Peralatan di PT. Pertamina EP Asset 3 Tambun - 17 Pipa Penyalur