CLOSE

List of Consulting Experiences

YearProject Title
2023Pipeline Integrity Specialist
2023Jasa Pemborongan Pekerjaan Pengembangan dan Pembaharuan Data Risk Based Inspection (RBI) Serta Studi Sisa Umur Layan PSV PT Badak
NGL Tahun 2023
2022Jasa Pemeriksaan Material dan Pemetaan Cacat saat Turn Around (TA) terhadap Turbin PLTP Unit-4 Kamojang
2022Engagement an Independent Party for Root Cause Failure Analysis "RCA" on the GTCP B Unit GTCP Jabung Compressor
2021Warehouse Management System
2020Integrity Management Plan of Static Equipment for Wayang Windu Plant
2019Analisa Risk Based Inspection (RBI) Static Equipment Pabrik dan Membuat Software RBI
2019Material Inspection & Analysis for Bolt of Coupling CO-0302
2018Pekerjaan Jasa Remaining Life Assessment terkait Resertifikasi/Sertifikasi Peralatan di PT. Pertamina EP Asset 3 Tambun - 17 Pipa Penyalur
2018Pekerjaan Jasa Remaining Life Assessment terkait Resertifikasi/Sertifikasi Peralatan di PT. Pertamina EP Asset 3 - 320 Bejana Tekan / Vessel
2018Pekerjaan Studi RBI Peralatan Statistik PT. Badak NGL
2018Risk Based Inspection Assessment
2018Level 3 Pipepline Dent Asssessment at PHE WMO
2018Failure Analysis For Tube HE C523
2018AIMS & PIMS Maintenance
2017Pipeline Assessment 28 inch WIKA-RABANA-KELSRI
2017Riser Assessment Third Party Activity Around Jetty at PHE WMO
2017Pipeline Free Span Assessment and Scoping for Recertification
2017Cathodic Protection Survey & Analysis Services
2017Fitness for Purpose, Failure Avoidance and Asset Life Extension
2017RBI Assessment and Inspection Plan of Pressure Vessels
2017Failure Analysis of Cut off Shaft PU-C301B & PU-C503B
2017In-situ Metalografi Tube Furnace PS2
2017Crude Oil Krisna and Rama Analysis
2017Riser Integrity Assessment at PHE WMO
2017Fitness for Service Jalur Pipa Baja
2017Provision of Cathodic Protection Survey for KGPF
2016Fitness for Service Assessment 16" Crude Oil Pipeline Simpang Cucut to Pematang
2016Laboratory Servics for On Site Fluid Sampling and Analysis
2016Fitness for Service Assessment 10" Rangau GS
2016Lube Oil Analysis
2016Provision of Development of Corrosion under Insulation (CUI) Management Services
2016Provision of Project Support Service FE GPO
2016Inspeksi Elektrikal Terminal Crane
2016Risk Based Inspection of 120 Unit Tank
2016Pemeriksaan Material pada 2 Unit Tangki LPG Arun NGL - Aceh dengan Metode Insitu Metalografi (10 Spot Tangki)
2016Service for AIMS Phase 1 & PIMS Maintenance
2016Hot Oil Analysis
2016Perhitungan untuk Remaining Life Time (RLT) untuk BW Boiler di lokasi PT. Vale Indonesia - Sorowako
2016Pemeriksaan dengan Insitu Metalografi untuk Boiler di PT. Vale Indonesia - Sorowako
2016Pipeline Integrity & Corrosion Engineering
2015High Risk Risers Inspection by Long Range Ultrasonic Testing
2015Pipeline Corrosion Assessment
2015Risk Based Inspection of 95 Unit Tank
2015Improvement of Pipeline Integrity Management System Methodology
2015Perhitungan Operasi Berdasarkan Hasil Insitu Metalografi dan Uji Keras BW Boiler
2015Pipeline Protection Assessment
2015Study Review of Failure Analysis GT 7”
2015Pipeline Integrity Management System Detail Review and Reporting for 5 (five) Pipelines Assessment
2015Risk Based Inspection of 10 Unit Tank
2015Lube Oil Analysis of 4 Sample
2015
Material Examination & Analysis of Steel
2014Pilot Project of Risk Based Inspection
2014Failure Analysis Sampel Insulating Joint 4” PT. Taehan Textiles & CV. Triona Multi Industri
2014Gas Analysis of H2S and Methane form V-808 and H-800 Krisna-P
2014Failure Analysis of Chemical Tube
2014Failure Analysis of Valve Bolt
2014Coating / Painting Testing
2014Failure Analysis of Flexible Hose
2014Pilot Testing for Non Metallic Pipeline
2014Painting Test
2014Risk Based Inspection on PCMS
2014Hardness Test for Spacer
2014
Gas Analysis of H2S and Methane for Rama-H
2013Asset Integrity Management System Phase 1 Development
2013Failure Analysis Sample Pipa Baja Jalur Paya Pasir - Simpang Kantor Diameter 12"
2013Fluid Sampling Analysis in CBU & NBU Area
2013Re-run Risk Based Inspection for Supat Field
2013Failure Analysis Pipa diameter 4 dan 6 inci Area Banten Timur dan Pipa diameter 4 inci Area Industri Bogor
2012Fitness for Service of Shell & FEM Regenerator of FCCU Kilang Sungai Gerong
2012Failure Analysis Sampel Pipa 6” Batu Ceper & Pipa 10” Pasar Cibinong
2012
Failure Analysis of 320D Boom Cracking
2011Asset Integrity of Topsite Facilities
2011Risk Based Inspection Area FOC I & LOC I Kilang PT. Pertamina (Persero) Refinery Unit IV Cilacap
2011Failure Analysis of Flexible Hose / Expansion Joint
2011Mechanical Testing of Bolt and Spacer
2011Failure Analysis of Excavator Stick Arm
2011Pipeline Integrity Management System Development Phase 2
2011Thermographic Inspection
2011
Inspection & Assessment of Pabelokan Gas Plant
2010Study, Evaluation and Run Simulation
2010Stress Analysis of Savitri-A Failed Conductor
2010Failure Analysis of Gas Plant Broken Bolt
2010Failure Analysis of Bolt
2010Corrosion Analysis of Pipeline & Conductor Detail
2010Failure Analysis of Cooler at KRA Platform
2010
Corrosion Analysis of Piping Detail
2009Failure Analysis of Cracking Boiler
2009Corrosion Rate Calculation Analysis
2009IMR Plan Development for Underwater Facilities
2008Pipeline Risk Assessment
2008Pipeline Integrity Systems
2008Failure Analysis of GTG#1 Bolt at Seafox
2008Heat Exchanger Inspection
2008Material Testing of Inconnel 600/625
2008Corrosion Assessment of Gas Facilities
2008Corrosion Protection Assessment of Banuwati-A and Zelda-PC Platforms
2008Failure Analysis of Wire Rope
2008Chartered Institute of Purchasing and Supply Survey
2008
Failure Analysis of Cooler & Corrosion Protection Assessment
2007Failure Analysis of Check Valve Stud Bolt
2007Re-evaluation & Re-engineering of Mixed Xylene Tank
2007Tube Leak Analysis of Zelda F Heat Exchanger E-200
2007
External Corrosion Assessment of Pabelokan Gas Plant
2006Cathodic Protection Programs of PBA Gas Plant
2006
Assessment of Corrosion Protection System for 8" Gas Pipeline